One engineer
Large firms split a bridge between a surveyor, a draughtsman and an account manager. Here one person climbs the span, writes the record and signs the review, so the file reads as one line of reasoning from footing to deck.
Two days on site with rope access, a hammer and a moisture meter. Every member is photographed and numbered.
A dated register of every joint, crack and repair, kept in one file you own and can hand to anyone.
A plain load rating with the reasoning written out, and a short list of what to fix first.